15th May 2012- Finally after more than 5 months since construction started, the 2 Nissen Huts are habitable. The doors and locks have been fixed and the rainwater collected has so far filled two 150 gallon tanks. The toilets are also functioning.

The road up the centre is being repaired. The nursery for plants will be set up soon. What is left is the solar energy supply which we hope will be resolved within the next few months.

ye15may12 interiors completedx.10 may 12 interior doneyd15 may 12 2nd hut completedyb 15 may 12 1st hut completedyc15 may 12 Toilet completedya15 may 12 (2)w.10 may 12 water catchment